EXCALIBUR CRUX · THE SYSTEMS ROOM

Systems Thinking

See the whole. Solve the real.

Most problems a leader meets are symptoms. Systems thinking is the discipline of looking beneath the waterline — at the loops, bottlenecks and structures that keep producing the same result.

Hand-drawn sheet of systems thinking tools: the iceberg, DSRP, Cynefin, rich picture, influence diagram, 7 habits of systems thinkers, stocks and flows, behaviour over time graph, balancing and reinforcing loops, systems archetypes, 6 tools and 12 leverage points
Twelve tools of the systems thinker
Systems Thinking — Excalibur document, page 1 of 56
Systems Thinking — Excalibur document
Page 1 / 56
Hand-lettered poster of system thinking basics: hidden causes, chain reactions, bottlenecks, feedback loops, optimization, logic, flow management, bottleneck detection, scalability and resource planning
The ten basic ideas — don't just fix the problem, improve the system